Click here to follow us on Facebook

 

 

DB Schenker breaks ground on London facility

By control on February 2, 2012

European developer Segro has begun construction on DB Schenker’s new, 9,900-square-meter logistics facility at London’s Heathrow airport. The facility, which is designed to reduce carbon emissions by 25 percent, is slated for completion in mid-2012.

According to a press release, the logistics center will have low- and zero-carbon air source heat pumps that will serve a duel purpose: cooling the office while providing under-floor heating for the warehouse. Schenker’s facility will also feature a heat-recovery ventilation system, both passive-infrared and photoelectric lighting controls, and rainwater harvesting.

Such measures are intended to help the facility achieve a BRE Environmental Assessment Method rating of “very good,” according to the press release.

“We will be working in a building [that] has been designed to meet our needs both now and in the future and in an ergonomically sustainable way, which will ensure maximum productivity at all times,” Per Holst-Nielsen, managing director of Schenker Ltd., said in a statement.

Holst-Nielsen projects that this center will also boost Schenker’s freight volumes in the UK. “The move to this new facility will be a great stride forward for our whole Heathrow team, and I believe it inspires confidence about the future growth of the UK operation,” he stated.

Alan Holland, Segro’s joint ventures director, echoes Holst-Nielsen’s remarks, stating that London is the ideal setting for such a facility. “The high cargo volumes handled at Heathrow during 2011 have contributed to good demand for well-located space on and around the airport, particularly for site and properties that can offer immediate air-side access,” Holland said.

What Are Your Thoughts?

* Disclaimer: Please note that libellous or offensive comments are not allowed.